The Campus Center and the Science and Engineering building tower over the campus.
A painter starts filling in the sign on the gate above the Campus Center.
Food Services Director Fidel Cabuena and Vice President of Finance and Administrative Services Mike Giacomini pose on the third floor of the new Campus Center.
An exterior view of the Campus Center from the Library.
The door to the walk-in freezer in the new cafeteria.
The carpeting on the first floor of the new Campus Center.
The breakroom area for Student Government on the first floor of the main Campus Center building.
This office space for SGA and Office of Student Life staff offers a view of students as they walk around the campus.
A corner office space for Student Life staff on the first floor of the Campus Center.
The Student Government Association will conduct their meetings in this boardroom on the Campus Center first floor.
The lighting fixtures in the new Campus Center provide a warm ambiance to the building.
Construction workers put the finishing touches on the windows in the Campus Center breezeway.
A terrace on the second floor of the Campus Center provides a view of the CSS building and the Science and Engineering construction.
Carpeting on the second floor of the new Campus Center.
The third floor entrance of the new Campus Center provides another breathtaking view of the Administration building and the Panorama bluffs.
Members of the Project Management Team accompany the BC staff on the Campus Center tour.
Fidel Cabuena takes a selfie on the third floor of the Campus Center.
The light fixtures in the convention hall on the third floor of the Campus Center are chic and modern.
The construction team are busy at work finishing the third floor convention hall.
The convention hall has a large catering area for Food Services to be able to prepare meals to conference attendees.
A bathroom on the Campus Center third floor.
The breezeway between the two annexes of the main Campus Center building.
A construction worker puts the finishing touches on the executive rooms on the second floor of the Campus Center.
The executive boardroom offers a view of the campus from the second floor.
A wallpaper mural adorns the executive breakroom on the second floor of the Campus Center.
A construction worker welds the flooring on the Science and Engineering building.
New turf was installed on the courtyard between CSS and the Performing Arts Center.
The water infrastructure in the Math and Science building was improved with funding from Measure J.
The new women's bathroom in Memorial Stadium.
The new concession stand in Memorial Stadium.
The new LCD scoreboard in Memorial Stadium.
The new men's room in Memorial Stadium.
A new generator was installed in Memorial Stadium as part of the Phase 2 improvements.